POWER REQUIREMENTS
Rack Position
2-18
Installation Manual August, 2011
POWER REQUIREMENTS
The IP
edge
server should have a dedicated AC power circuit. The
specific input voltage and current requirements for each server is listed
the specifications for each model.
UPS
RECOMMENDATIONS
Toshiba recommends an uninterruptible power supply (UPS) with power
conditioning for the IP
edge
server. The recommended UPS from ONEAC
. The UPS shown in the table include power
conditioning. If you already have a UPS in place Toshiba recommends
that you install the power conditioner listed in
Table 2-3 IP
edge
System Power Conditioner and UPS
IP
edge
Server
EC
EM
EP
Power Conditioner
PC180A-S2S
PC360A-S4S
PC075A-S2S
Battery
Backup
Time
30 Minutes
ON700XAU-SN
ON700XAU-SN
ONE254AG-SE
1 Hour
ON700XAU-SN1
ON700XAU-SN1
ONE254AG-SE
2 Hours
ON700XAU-SN1
ON700XAU-SN1
ONE604AG-SE
4 Hours
ON700XAU-SN1
ON700XAU-SN2
ONE300XA-W-SV1
8 Hours
ON700XAU-SN2
ON700XAU-SN4
ONE300XA-W-SV1
Summary of Contents for IP edge EC
Page 1: ...TOSHIBA Telecommunication Systems Division Installation Manual Title Page August 2011 ...
Page 18: ...This page is intentionally left blank ...
Page 32: ...This page is intentionally left blank ...
Page 78: ...This page is intentionally left blank ...
Page 82: ...This page is intentionally left blank ...
Page 92: ...This page is intentionally left blank ...
Page 96: ...This page is intentionally left blank ...
Page 100: ...This page is intentionally left blank ...
Page 144: ...This page is intentionally left blank ...
Page 205: ...THIS IS THE END OF THE DOCUMENT ...
Page 206: ......