i.
Align the right flange of the exhaust
shield (the flange with 2 holes) to the
rear surface of the lower-left engine
guard (
).
G018637
Figure 7
Heat Shield Installation on US Domestic Mower
ii.
Align the bottom edge of the
exhaust-shield right flange to the
bottom edge of the engine guard
(
).
iii.
Align the left flange of the exhaust
shield (the flange with 1 hole) to the
surface of the small, angular area of
the lower-left engine guard. (
).
Note:
Ensure the left flange (the
flange with 1 hole) of the exhaust
shield is flush with the engine-guard
surface.
iv.
Align the top edge of the
exhaust-shield left flange and
the top edge of the lower-left engine
guard so that the flange edge and the
guard edge are parallel (
).
v.
Mark the outline of all holes in the
exhaust-shield flanges on to the
lower-left engine guard, and remove
the exhaust shield from the engine
guard.
•
For International (TE) Mowers
i.
Align the holes of the exhaust-shield
right flange (the flange with 2 holes)
to the two left-most-vertical slots in
the lower-left engine guard (
G018638
1
Figure 8
Heat Shield Installation on International (TE) Mower
1.
Flange-hex-head bolt (3/8 x 1 inch) and Nut (3/8 inch)
ii.
Align the bottom edge of the right
flange of the of the exhaust shield to
the bottom edge of the engine guard
(
).
iii.
Loosely secure the right flange of the
exhaust shield to the engine guard
with 2 flange-hex-head bolts (3/8 x 1
inch) and 2 flange nuts (3/8 inch).
iv.
Align the left flange of the exhaust
shield (the flange with 1 hole) to
angular area of the lower-left engine
guard (
).
Note:
Ensure that the left flange
(the flange with 1 hole) of the exhaust
shield is flush with the engine-guard
surface.
v.
Mark the outline of the hole in the left
flange of the exhaust shield on to the
lower-left engine guard.
vi.
Remove the fasteners and exhaust
shield from the engine guard.
3.
Locate the center of the marks on the lower-left
engine-guard surface, and center-punch the locations.
4.
Drill a 10 mm (3/8 inch) hole in the engine guard at
the center-punch mark created in step
10