1
Removing the 2/3 or Full
Bed
No Parts Required
Procedure
Note:
If the Workman is equipped with a H.D. Hitch
Frame it does not have to be removed from the vehicle
but the weight of the hitch frame must be subtracted
from the payload capacity of the hopper. Refer to the
Workman
Operating Instructions
.
1.
Park the vehicle on a level surface.
2.
Start the engine. Engage the hydraulic lift lever
and lower the bed until the cylinders are loose
in the slots.
3.
Release the lift lever. Shut off the engine and
remove the key.
4.
Remove the lynch pins from the outer ends of
the cylinder rod clevis pins (
g002368
Figure 3
1.
Cylinder rod end
4.
Lynch pin
2.
Bed mounting plate
5.
Rear slots (Full bed)
3.
Clevis pin
6.
Front slots (2/3 bed)
5.
Remove the clevis pins securing the cylinder rod
ends to the bed mounting plates by pushing the
pins towards the inside (
6.
Remove the lynch pins and clevis pins securing
the pivot brackets to the frame channels (
g002369
Figure 4
1.
Left rear corner of bed
4.
Clevis pin
2.
Vehicle frame channel
5.
Lynch pin
3.
Pivot plate
7.
Lift the bed off of the vehicle.
CAUTION
The full bed weighs approximately 148 kg
(325 lb), so do not try to install or remove
it by yourself.
Use an overhead hoist or get the help of
2 or 3 other people.
8.
Store the cylinders in the storage clips. Engage
the hydraulic lift lock lever on the vehicle to
prevent accidental extension of the lift cylinders.
7
Summary of Contents for 44225
Page 5: ...decal133 8061 133 8061 5...
Page 27: ...Notes...
Page 28: ...Notes...
Page 29: ...Notes...