Model: TTT-710
Table of Contents
- 6 -
Table of Contents
●
Introduction
······················································································· 1
●
Safety Information
········································································· 2
(1) Meaning of markings
⋅⋅⋅⋅
2
(2) Safety compliance items
⋅⋅⋅⋅
2
(3) Notes on use of the instruction manual
⋅⋅⋅⋅
3
●
Warranty
···························································································· 4
●
Reading Guide
················································································ 5
1. Content
of
Package
··································································· 9
2. Specifications and Functions
················································ 11
(1) Specifications
⋅⋅⋅⋅
11
(2) Functions
⋅⋅⋅⋅
13
3. Name and Function of Each Part
········································ 14
(1) Name of main parts
⋅⋅⋅⋅
14
(2) Key types and functions of operation panel
⋅⋅⋅⋅
15
4. Preparations
················································································· 16
4.1 Installation Preparations
····································································· 16
4.2 Wiring
···························································································· 18
(1) Power cable and ground connections
⋅⋅⋅⋅
18
(2) Connection to analytical instruments
⋅⋅⋅⋅
19
4.3 Piping
···························································································· 25
(1) Piping diagram
⋅⋅⋅⋅
25
(2) Pure water tank connection
⋅⋅⋅⋅
26
(3) Waste solution tank connection
⋅⋅⋅⋅
27
4.4 Table Plate Mounting
········································································· 30
4.5 Mounting the electrode cartridge, electrode, and titration nozzle
·················· 31
4.6 Optional Parts Connection
·································································· 35
(1) Air pump box connection
⋅⋅⋅⋅
35
(2) Waste water valve connection
⋅⋅⋅⋅
37
(3) Propeller stirring unit connection
⋅⋅⋅⋅
39
(4) Reagent washing kit connection
⋅⋅⋅⋅
40
5. Basic
Operation
·········································································· 46
5.1 Operation Screens Map
····································································· 46
5.2 Basic Operation
··············································································· 49
Summary of Contents for TTT-710
Page 115: ... 114 ...
Page 117: ... 116 ...