![Tigo BMS Installation Manual Download Page 39](http://html.mh-extra.com/html/tigo/bms/bms_installation-manual_1115951039.webp)
Commissioning – Run the Tigo Energy Intelligence App
EI Residential Solar Solution Installation Manual |
35
11.
Select a
Manufacturer, Model
, and
PV
Modules count and
tap
Save
.
12.
Repeat these steps for as many strings as needed and tap
Done
.
13.
Review your entries and tap the back arrow.
14.
On the
EI Setup/Specify Inverter Details
screen, tap
Done
to return to the primary commissioning screen.