
Installation – Assemble and Mount the System Bracket
EI Residential Solar Solution Installation Manual |
13
To mount the system bracket:
1.
Single phase: Attach the system bracket to the already-installed battery bracket.
2.
Mount the system bracket to the wall using appropriate mounting hardware at the
locations shown in the diagram. Ensure the vertical plates are plumb and the brackets
are level.
Three phase: Mount the system bracket so that the bottom of the horizontal link plate
has at least 455mm clearance above the floor or top of the battery.