
Installation – Install the Link
EI Residential Solar Solution Installation Manual |
18
To make link AC connections:
1.
Single phase: Connect conductors from a breaker on the house main breaker panel to
link grid terminals.
Three phase:
2.
Connect the GRID earthing wire to the link earthing bar.