Installation – Install the Link
EI Residential Solar Solution Installation Manual |
19
3.
Connect conductors from a breaker on the house breaker panel or backup load panel to
the link LOAD terminals.
Single phase:
Three phase:
To connect PV strings to the link, run the PV conductors through the link PV port and connect
them to their respective PV + and – terminals.
Single phase:
Three phase: