Preventative Maintenance Checklist (81000)
34
Zero-Gravity
®
Radiation Protection System Preventative Maintenance Checklist
Figure 30: Carriage Cover
Figure 31: Drop Tube, Plate, and Carriage
(6) M8-1.25X
30MM long
screws
Leaded Acrylic Hardware Inspection
1. While the system is not in use, inspect all hardware on the leaded acrylic shield
to ensure they are in place and fastened tightly.
2. Check each of the (4) 8-32 X 1.25” long screws connecting the shield to the ball
joint sub-assembly to ensure they are in place and torqued to 16.8 inch-pounds
using a calibrated inspection tool. (Figure 32: ZGCMRS Shield Attachment Point)
3. Contact a TIDI Products authorized representative or TIDI Products service for
repairs and / or replacement of components. Replacement and repairs may only
be completed by TIDI Products authorized personnel.
4. If additional support is needed, contact TIDI Technical Service using the provided
contact information.