Preventative Maintenance Checklist (81000)
29
Zero-Gravity
®
Radiation Protection System Preventative Maintenance Checklist
Figure 23
Drop Tube Carriage Mount Hardware Inspection
(ZGCM-HSA)
1. While the system is not in use, remove the (4) 10-32 X ½-inch-long panhead
Phillips screws from the carriage cover removing the carriage cover with the
2. Check each of the (12) M8 X 30-millimeter bolts connecting the drop tube to the
Carriage plate to ensure they are in place and torqued to 350 inch-pounds (29
foot-pounds) (39 Newton-meters) using a calibrated inspection tool. (Figure 24)
3. Once complete, attach the Carriage Cover using (4) 10-32 X 1/2-inch-long
panhead Phillips screws. Check each of the (4) 10-32 X 1/2-inch-long panhead
Phillips screws to ensure they are in place and secured. (Figure 25)
4. Contact a TIDI Products authorized representative or TIDI Products service for
repairs and / or replacement of components. Replacement and repairs may only
be completed by TIDI Products authorized personnel.
5. If additional support is needed, contact TIDI Technical Service using the provided
contact information.