Preventative Maintenance Checklist (81000)
26
Zero-Gravity
®
Radiation Protection System Preventative Maintenance Checklist
Figure 19
Toe Clamp Mounting Bolt and Cover Inspection (ZGCM-48 |
ZGCM-66 | ZGCM-HSA)
1. While the system is not in use, remove the toe clamp covers.
2. Check each toe clamp mounting bolt to ensure it is in place and torqued to 100
foot-pounds (135 Newton-meters) using a calibrated inspection tool. (Figure 20)
3. Replace any missing to clamp mounting bolts and tightening all to 100 foot-
pounds (135 Newton-meters). Ensure bolts are tightened to 100 foot-pounds
(135 Newton-meters) using a calibrated inspection tool. (Figure 20)
4. Put the toe clamp covers back into place ensuring they are securely snapped in.
5. Contact a TIDI Products authorized representative or TIDI Products service for
repairs and / or replacement of components. Replacement and repairs may only
be completed by TIDI Products authorized personnel.
6. If additional support is needed, contact TIDI Technical Service using the provided
contact information.