Preventative Maintenance Checklist (81000)
24
Zero-Gravity
®
Radiation Protection System Preventative Maintenance Checklist
Figure 17: ZGCM-HSA
Translation
And Rotation
Translation
Rotation
Translation
Collision Inspection (ZGHSA | ZGCM-HSA | ZGCM-48 |
ZGCM-66)
1. While the system is not in use, slowly move the system along the monorail
observing the air space required for the system. Inspect for any obstructions with
other equipment to identify collision hazards.
(Figure 15: ZGCM-48 & ZGCM-66)
(Figure 16: ZGHSA) (Figure 17: ZGCM-HSA)
2. If additional support is needed, contact TIDI Technical Service using the provided
contact information.
Boom Arm to Drop Tube Hardware Inspection
(ZGCM-48 | ZGCM-66)
1. While the system is not in use, check each of the (8) M8 X 30 millimeter screws
attaching the Boom Arm to the drop Tube to ensure they are in place and torqued
to 350 inch-pounds (29 foot-pounds) (39 Newton-meters) using a calibrated
inspection tool. (Figure 18)
2. Contact a TIDI Products authorized representative or TIDI Products service for
repairs and / or replacement of components. Replacement and repairs may only
be completed by TIDI Products authorized personnel.
3. If additional support is needed, contact TIDI Technical Service using the provided
contact information.