ROUTINE MAINTENANCE
7-15
53 COUPE
THE FEDERAL WATER POLLUTION CONTROL ACT PROHIBITS THE
DISCHARGE OF OIL OR OILY WASTE INTO OR UPON THE NAVI-
GABLE WATERS OF THE UNITED STATES, OR THE WATERS OF
THE CONTIGUOUS ZONE, OR WHICH MAY AFFECT NATURAL RE-
SOURCES BELONGING TO, APPERTAINING TO, OR UNDER THE
EXCLUSIVE MANAGEMENT AUTHORITY OF THE UNITED STATES,
IF SUCH DISCHARGE CAUSES A FILM OR DISCOLORATION OF
THE SURFACE OF THE WATER OR CAUSES A SLUDGE OR EMUL-
SION BENEATH THE SURFACE OF THE WATER. VIOLATORS ARE
SUBJECT TO SUBSTANTIAL CIVIL PENALTIES AND/OR CRIMINAL
SANCTIONS, INCLUDING FINES AND IMPRISONMENT. REPORT ALL
DISCHARGES TO THE NATIONAL RESPONSE CENTER AT 1-800-424-
8802 OR TO YOUR LOCAL U.S. COAST GUARD OFFICE BY PHONE
OR VHF RADIO, CHANNEL 16.
WARNING
!
CAUTION
!
Always return the oil change system valves to the closed position
after using the system. Failure to do so can result in transfer of oil
between the engines and/or generator due to crankcase pressures.
CAUTION
!
Always use the correct amount and type of oil recommended by the
equipment manufacturer. Failure to do so can result in premature
equipment failure and loss of equipment warranty.
7.6.4 Ventilation System
The engine room ventilation system is comprised of port and starboard air inlet
plenums. The engine room intake plenums are designed to remove moisture
from the incoming air and drain it overboard. The plenum drains are located in
the bottom of each plenum at the aft end, and run aft to a thru-hull fitting. Check
the hoses twice a year for secure connections. Refer to section 7.8 for drainage
maintenance information.
Summary of Contents for 53 COUPE
Page 4: ...This page intentionally left blank ...
Page 6: ...This page intentionally left blank ...
Page 11: ...SAFETY LABEL LOCATIONS iii 53 COUPE 10 10 2 2 24 24 24 24 16 16 22 23 17 12 3 23 22 20 ...
Page 24: ...TABLE OF CONTENTS TOC 8 53 COUPE This page intentionally left blank ...
Page 50: ...EQUIPMENT AND FEATURES 1 24 53 COUPE This page intentionally left blank ...
Page 59: ...BELOW DECK FEATURES EQUIPMENT 2 9 53 COUPE Figure 2 8 VIP head Figure 2 9 Utility room ...
Page 96: ...OPERATING YOUR BOAT 5 20 53 COUPE This page intentionally left blank ...
Page 108: ...COMMISSIONING YOUR BOAT 6 12 53 COUPE This page intentionally left blank ...
Page 130: ...ROUTINE MAINTENANCE 7 22 53 COUPE This page intentionally left blank ...
Page 153: ...APPENDIX C MAINTENANCE SCHEDULES C 3 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 154: ...APPENDIX C MAINTENANCE SCHEDULES C 4 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 155: ...APPENDIX C MAINTENANCE SCHEDULES C 5 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 156: ...APPENDIX C MAINTENANCE SCHEDULES C 6 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 157: ...D 1 53 COUPE Appendix D BOATING ACCIDENT REPORT ...
Page 158: ...APPENDIX D BOATING ACCIDENT REPORT D 2 53 COUPE ...
Page 159: ...APPENDIX D BOATING ACCIDENT REPORT D 3 53 COUPE ...
Page 160: ...APPENDIX D BOATING ACCIDENT REPORT D 4 53 COUPE ...
Page 161: ...APPENDIX D BOATING ACCIDENT REPORT D 5 53 COUPE ...
Page 162: ...APPENDIX D BOATING ACCIDENT REPORT D 6 53 COUPE ...
Page 163: ...E 1 53 COUPE Appendix E FLOAT PLAN ...
Page 164: ...APPENDIX E FLOAT PLAN E 2 53 COUPE ...
Page 166: ...APPENDIX E FLOAT PLAN E 4 53 COUPE Operator Notes ...