STORING & WINTERIZING YOUR BOAT
8-7
53 COUPE
3. Pour three (3) gallons of potable water antifreeze into the water tank via
the WATER fill fitting in the water connection locker.
4. Switch ON the FRESH WATER PUMP 1 & 2 breakers and the VACUUM
PUMP breakers on the DC Distribution Panel.
5. Flush the toilet until antifreeze starts to enter the toilet bowl.
6.
Continue to flush the toilet until 2-3 gallons of antifreeze has gone through
the toilet and into the waste holding tank. Use enough potable water anti-
freeze to assure adequate protection.
7. Switch OFF the FRESH WATER PUMP 1 & 2 breakers and the VACUUM
PUMP breakers on the DC Distribution Panel.
8. Pump out the waste holding tank. See chapter 7 for instructions.
8.9 ENGINES, DRIVELINE AND GENERATOR
The engines, transmissions, Volvo
®
IPS drives (if installed), and generator should
be prepared for storage according to the manufacturers’ recommendations. Please
refer to the appropriate user manuals for specific instructions.
8.9.1 Exhaust Systems
The exhaust systems for each
engine and the generator
must have all remaining water
drained.
To drain the generator muffler,
remove the drain plug from
the muffler, allow the water
to drain out, and replace the
drain plug (
Figure 8-4
).
8.9.1.1 Volvo
®
Engines
Follow the winterization pro-
cedure outlined in the engine
user manual.
Figure 8-4:
Generator muffler drain plug
Summary of Contents for 53 COUPE
Page 4: ...This page intentionally left blank ...
Page 6: ...This page intentionally left blank ...
Page 11: ...SAFETY LABEL LOCATIONS iii 53 COUPE 10 10 2 2 24 24 24 24 16 16 22 23 17 12 3 23 22 20 ...
Page 24: ...TABLE OF CONTENTS TOC 8 53 COUPE This page intentionally left blank ...
Page 50: ...EQUIPMENT AND FEATURES 1 24 53 COUPE This page intentionally left blank ...
Page 59: ...BELOW DECK FEATURES EQUIPMENT 2 9 53 COUPE Figure 2 8 VIP head Figure 2 9 Utility room ...
Page 96: ...OPERATING YOUR BOAT 5 20 53 COUPE This page intentionally left blank ...
Page 108: ...COMMISSIONING YOUR BOAT 6 12 53 COUPE This page intentionally left blank ...
Page 130: ...ROUTINE MAINTENANCE 7 22 53 COUPE This page intentionally left blank ...
Page 153: ...APPENDIX C MAINTENANCE SCHEDULES C 3 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 154: ...APPENDIX C MAINTENANCE SCHEDULES C 4 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 155: ...APPENDIX C MAINTENANCE SCHEDULES C 5 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 156: ...APPENDIX C MAINTENANCE SCHEDULES C 6 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 157: ...D 1 53 COUPE Appendix D BOATING ACCIDENT REPORT ...
Page 158: ...APPENDIX D BOATING ACCIDENT REPORT D 2 53 COUPE ...
Page 159: ...APPENDIX D BOATING ACCIDENT REPORT D 3 53 COUPE ...
Page 160: ...APPENDIX D BOATING ACCIDENT REPORT D 4 53 COUPE ...
Page 161: ...APPENDIX D BOATING ACCIDENT REPORT D 5 53 COUPE ...
Page 162: ...APPENDIX D BOATING ACCIDENT REPORT D 6 53 COUPE ...
Page 163: ...E 1 53 COUPE Appendix E FLOAT PLAN ...
Page 164: ...APPENDIX E FLOAT PLAN E 2 53 COUPE ...
Page 166: ...APPENDIX E FLOAT PLAN E 4 53 COUPE Operator Notes ...