COMMISSIONING YOUR BOAT
6-6
53 COUPE
DISINFECT THE ENTIRE FRESH (POTABLE) WATER SYSTEM PRIOR
TO USE AND YEARLY AT THE BEGINNING OF EACH SEASON. FAIL-
URE TO DO SO CAN RESULT IN DEVELOPING COLIFORM BACTE-
RIA OR OTHER DISEASE-CAUSING ORGANISMS (PATHOGENS) IN
THE WATER SYSTEM. CONSUMPTION OF CONTAMINATED WATER
COULD RESULT IN SEVERE PERSONAL INJURY OR DEATH.
WARNING
!
Follow this procedure to disinfect the fresh water system, kill bacteria that
may be present, and prepare the system for operation:
Note: The fresh water system may be filled with nontoxic potable water an
-
tifreeze. If antifreeze was not used, skip to step 7.
1. Turn both water heater valves fully counterclockwise to the normal opera
-
tion position (
Figure 6-2
).
Figure 6-2: Water heater valves in
normal operation position
Figure 6-3: Water heater valves in
bypass position
2. Open all faucets (hot & cold), setting single faucets to the warm position.
3. Switch ON the FRESH WATER PUMP 1 & 2 breakers, located on the DC
Distribution Panel. The pumps are self-priming.
4. When anti-freeze stops flowing out of the faucets, switch the pump break
-
ers OFF. Do not close faucets.
Summary of Contents for 53 COUPE
Page 4: ...This page intentionally left blank ...
Page 6: ...This page intentionally left blank ...
Page 11: ...SAFETY LABEL LOCATIONS iii 53 COUPE 10 10 2 2 24 24 24 24 16 16 22 23 17 12 3 23 22 20 ...
Page 24: ...TABLE OF CONTENTS TOC 8 53 COUPE This page intentionally left blank ...
Page 50: ...EQUIPMENT AND FEATURES 1 24 53 COUPE This page intentionally left blank ...
Page 59: ...BELOW DECK FEATURES EQUIPMENT 2 9 53 COUPE Figure 2 8 VIP head Figure 2 9 Utility room ...
Page 96: ...OPERATING YOUR BOAT 5 20 53 COUPE This page intentionally left blank ...
Page 108: ...COMMISSIONING YOUR BOAT 6 12 53 COUPE This page intentionally left blank ...
Page 130: ...ROUTINE MAINTENANCE 7 22 53 COUPE This page intentionally left blank ...
Page 153: ...APPENDIX C MAINTENANCE SCHEDULES C 3 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 154: ...APPENDIX C MAINTENANCE SCHEDULES C 4 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 155: ...APPENDIX C MAINTENANCE SCHEDULES C 5 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 156: ...APPENDIX C MAINTENANCE SCHEDULES C 6 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 157: ...D 1 53 COUPE Appendix D BOATING ACCIDENT REPORT ...
Page 158: ...APPENDIX D BOATING ACCIDENT REPORT D 2 53 COUPE ...
Page 159: ...APPENDIX D BOATING ACCIDENT REPORT D 3 53 COUPE ...
Page 160: ...APPENDIX D BOATING ACCIDENT REPORT D 4 53 COUPE ...
Page 161: ...APPENDIX D BOATING ACCIDENT REPORT D 5 53 COUPE ...
Page 162: ...APPENDIX D BOATING ACCIDENT REPORT D 6 53 COUPE ...
Page 163: ...E 1 53 COUPE Appendix E FLOAT PLAN ...
Page 164: ...APPENDIX E FLOAT PLAN E 2 53 COUPE ...
Page 166: ...APPENDIX E FLOAT PLAN E 4 53 COUPE Operator Notes ...