ROUTINE MAINTENANCE
7-19
53 COUPE
4.
Remove the cable tie securing the overboard discharge seacock handle
(
Figure 7-7
).
5.
Open the overboard discharge
seacock by pulling the handle
to the vertical position.
6.
Switch ON the WASTE
PUMPOUT breaker on the
DC
Distribution Panel
.
Allow the
discharge pump to run until the
waste tank is empty. The
sound of the pump’s motor
load and speed will change
when the tank becomes empty.
Note:
Should the pump not
activate, check to see that the
seacock is in the OPEN position
and that the WASTE deck plate
cover is tightened securely. Oth
-
erwise the discharge system will
not operate properly.
7.
When the tank is empty, switch
OFF the WASTE PUMPOUT
breaker.
8.
Close the overboard discharge
seacock by pushing the handle
to the horizontal position, and
secure it (
Figure 7-7
).
The
overboard discharge seacock MUST be closed to prevent water from
being forced back into the system.
Note:
The optional overboard discharge seacock is secured in the closed
position before leaving the factory.
Figure 7-6: Overboard discharge
seacock under master stateroom
floor hatch
Figure 7-7: Seacock in closed
position and secured with cable tie
Summary of Contents for 53 COUPE
Page 4: ...This page intentionally left blank ...
Page 6: ...This page intentionally left blank ...
Page 11: ...SAFETY LABEL LOCATIONS iii 53 COUPE 10 10 2 2 24 24 24 24 16 16 22 23 17 12 3 23 22 20 ...
Page 24: ...TABLE OF CONTENTS TOC 8 53 COUPE This page intentionally left blank ...
Page 50: ...EQUIPMENT AND FEATURES 1 24 53 COUPE This page intentionally left blank ...
Page 59: ...BELOW DECK FEATURES EQUIPMENT 2 9 53 COUPE Figure 2 8 VIP head Figure 2 9 Utility room ...
Page 96: ...OPERATING YOUR BOAT 5 20 53 COUPE This page intentionally left blank ...
Page 108: ...COMMISSIONING YOUR BOAT 6 12 53 COUPE This page intentionally left blank ...
Page 130: ...ROUTINE MAINTENANCE 7 22 53 COUPE This page intentionally left blank ...
Page 153: ...APPENDIX C MAINTENANCE SCHEDULES C 3 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 154: ...APPENDIX C MAINTENANCE SCHEDULES C 4 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 155: ...APPENDIX C MAINTENANCE SCHEDULES C 5 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 156: ...APPENDIX C MAINTENANCE SCHEDULES C 6 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 157: ...D 1 53 COUPE Appendix D BOATING ACCIDENT REPORT ...
Page 158: ...APPENDIX D BOATING ACCIDENT REPORT D 2 53 COUPE ...
Page 159: ...APPENDIX D BOATING ACCIDENT REPORT D 3 53 COUPE ...
Page 160: ...APPENDIX D BOATING ACCIDENT REPORT D 4 53 COUPE ...
Page 161: ...APPENDIX D BOATING ACCIDENT REPORT D 5 53 COUPE ...
Page 162: ...APPENDIX D BOATING ACCIDENT REPORT D 6 53 COUPE ...
Page 163: ...E 1 53 COUPE Appendix E FLOAT PLAN ...
Page 164: ...APPENDIX E FLOAT PLAN E 2 53 COUPE ...
Page 166: ...APPENDIX E FLOAT PLAN E 4 53 COUPE Operator Notes ...