
7-1
53 COUPE
Chapter 7
ROUTINE MAINTENANCE
Your Tiara features a variety of systems and components that require routine or
scheduled maintenance. Refer to provided user manuals and Appendix C of this
manual for more information.
THIS VESSEL CONTAINS CHEMICALS KNOWN TO THE STATE
OF CALIFORNIA TO CAUSE CANCER AND BIRTH DEFECTS AND
OTHER REPRODUCTIVE HARM.
WARNING
!
7.1 FUEL SYSTEM
Your Tiara has one aluminum fuel tank. Fuel tank fills labeled DIESEL are located
on the port and starboard deck walkway. Fuel system vents are located below
the fuel fills in the hull sides.
Inspect the condition of the fuel hoses and clamps annually. Check that all hose
clamps and fill and vent fittings are tight.
FUEL IS EXTREMELY FLAMMABLE. ANY PROBLEMS WITH THE
FUEL SYSTEM MUST BE CORRECTED IMMEDIATELY. FAILURE TO
DO SO CAN RESULT IN SERIOUS INJURY OR DEATH.
WARNING
!
7.1.1 Engine Fuel Filter / Water Separators
The fuel filter/water separators for the main engines are located on the forward
engine room bulkhead (
Figure 7-1
). The filter elements should be changed either
every 500 engine hours; at every other oil change; annually; or if a power loss
is noticed, whichever comes first. Refer to the engine and filter user manuals for
additional information.
Summary of Contents for 53 COUPE
Page 4: ...This page intentionally left blank ...
Page 6: ...This page intentionally left blank ...
Page 11: ...SAFETY LABEL LOCATIONS iii 53 COUPE 10 10 2 2 24 24 24 24 16 16 22 23 17 12 3 23 22 20 ...
Page 24: ...TABLE OF CONTENTS TOC 8 53 COUPE This page intentionally left blank ...
Page 50: ...EQUIPMENT AND FEATURES 1 24 53 COUPE This page intentionally left blank ...
Page 59: ...BELOW DECK FEATURES EQUIPMENT 2 9 53 COUPE Figure 2 8 VIP head Figure 2 9 Utility room ...
Page 96: ...OPERATING YOUR BOAT 5 20 53 COUPE This page intentionally left blank ...
Page 108: ...COMMISSIONING YOUR BOAT 6 12 53 COUPE This page intentionally left blank ...
Page 130: ...ROUTINE MAINTENANCE 7 22 53 COUPE This page intentionally left blank ...
Page 153: ...APPENDIX C MAINTENANCE SCHEDULES C 3 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 154: ...APPENDIX C MAINTENANCE SCHEDULES C 4 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 155: ...APPENDIX C MAINTENANCE SCHEDULES C 5 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 156: ...APPENDIX C MAINTENANCE SCHEDULES C 6 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 157: ...D 1 53 COUPE Appendix D BOATING ACCIDENT REPORT ...
Page 158: ...APPENDIX D BOATING ACCIDENT REPORT D 2 53 COUPE ...
Page 159: ...APPENDIX D BOATING ACCIDENT REPORT D 3 53 COUPE ...
Page 160: ...APPENDIX D BOATING ACCIDENT REPORT D 4 53 COUPE ...
Page 161: ...APPENDIX D BOATING ACCIDENT REPORT D 5 53 COUPE ...
Page 162: ...APPENDIX D BOATING ACCIDENT REPORT D 6 53 COUPE ...
Page 163: ...E 1 53 COUPE Appendix E FLOAT PLAN ...
Page 164: ...APPENDIX E FLOAT PLAN E 2 53 COUPE ...
Page 166: ...APPENDIX E FLOAT PLAN E 4 53 COUPE Operator Notes ...