
APPENDIX B: GLOSSARY
B-3
53 COUPE
deck:
the floorlike platform of the boat
draft:
the depth of water a boat needs to float
dry rot:
a fungus attack on wooden areas
drydock:
a dock that can be kept dry during boat construction or repair
engine bed:
a sturdy structural member running fore-and-aft on which the engine
is mounted
even keel:
when a boat floats properly as designed
fender:
a soft object of rubber or plastic used between boats and piles, pier sides,
seawalls, etc. to protect the topsides from scarring and to cushion any shock of
the boat striking a fixed object
flying bridge:
an added set of controls above the level of the normal control station
fore:
the part of the boat in which the bow is located
foundering:
when a boat fills with water and sinks
freeboard:
the height of a boat’s topsides from the waterline to the deck
fuel pump:
feeds fuel under pressure
galley:
the kitchen of a boat
grab rail:
hand-hold fittings mounted on cabin tops or sides for personal safety
when moving around the boat, both on deck and below
ground tackle:
a general term including anchors, lines and other gear used in
anchoring
grounds:
a boat touches the bottom
gunwale:
the upper edge of a boat’s side
Summary of Contents for 53 COUPE
Page 4: ...This page intentionally left blank ...
Page 6: ...This page intentionally left blank ...
Page 11: ...SAFETY LABEL LOCATIONS iii 53 COUPE 10 10 2 2 24 24 24 24 16 16 22 23 17 12 3 23 22 20 ...
Page 24: ...TABLE OF CONTENTS TOC 8 53 COUPE This page intentionally left blank ...
Page 50: ...EQUIPMENT AND FEATURES 1 24 53 COUPE This page intentionally left blank ...
Page 59: ...BELOW DECK FEATURES EQUIPMENT 2 9 53 COUPE Figure 2 8 VIP head Figure 2 9 Utility room ...
Page 96: ...OPERATING YOUR BOAT 5 20 53 COUPE This page intentionally left blank ...
Page 108: ...COMMISSIONING YOUR BOAT 6 12 53 COUPE This page intentionally left blank ...
Page 130: ...ROUTINE MAINTENANCE 7 22 53 COUPE This page intentionally left blank ...
Page 153: ...APPENDIX C MAINTENANCE SCHEDULES C 3 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 154: ...APPENDIX C MAINTENANCE SCHEDULES C 4 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 155: ...APPENDIX C MAINTENANCE SCHEDULES C 5 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 156: ...APPENDIX C MAINTENANCE SCHEDULES C 6 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Page 157: ...D 1 53 COUPE Appendix D BOATING ACCIDENT REPORT ...
Page 158: ...APPENDIX D BOATING ACCIDENT REPORT D 2 53 COUPE ...
Page 159: ...APPENDIX D BOATING ACCIDENT REPORT D 3 53 COUPE ...
Page 160: ...APPENDIX D BOATING ACCIDENT REPORT D 4 53 COUPE ...
Page 161: ...APPENDIX D BOATING ACCIDENT REPORT D 5 53 COUPE ...
Page 162: ...APPENDIX D BOATING ACCIDENT REPORT D 6 53 COUPE ...
Page 163: ...E 1 53 COUPE Appendix E FLOAT PLAN ...
Page 164: ...APPENDIX E FLOAT PLAN E 2 53 COUPE ...
Page 166: ...APPENDIX E FLOAT PLAN E 4 53 COUPE Operator Notes ...