BP209 Series
7 Operation Instructions
Page 100
21424-D02
The
Normal Scan
pursues an ISO compliant measurements. The ISO standard requires that
"...
at least 10 measurements shall be taken. Approximately half of the measurements
shall be distributed within one Rayleigh Length on either side of the beam waist, and ap-
proximately half of them shall be distributed beyond two Rayleigh Lengths from the
beam waist
."
The first run of the Normal Scan is executed with respect to the entered number of
Data
Points
, in other words, like a coarse scan. A preliminary Rayleigh Length is calculated in order
to evaluate if the number of measured data points is sufficient to fulfill the ISO standard require-
ments. If so, a hyperbolic fit is applied. If not, a second run adds additional measurements
within the Rayleigh Length on both sides and/or beyond twice the Rayleigh Length.
For a M
2
measurement, running the Normal Scan is highly advised. The coarse scan is suitable
for a first estimate of the beam waist position or other preliminary measurements.
Reset
Restores the default settings for M² settings:
Parameter
Default Setting
Beam Width
Beam Width Clip (1/e²)
Wavelength
635 nm
Timeout
15 sec
Start
0 mm
Stop
200 mm
Min. Data Points
10
Scan Method
Normal Scan
Device Settings
It is important to set Gain and Base Line Correction of the Beam Profiler to Auto; Bandwidth to
125 kHz (see
).
31
Summary of Contents for M2MS
Page 2: ...Copyright 2022 Thorlabs Version Date 8 1 14 Feb 2022 ...
Page 73: ...BP209 Series 7 Operation Instructions Rev 8 1 14 Feb 2022 2022 Thorlabs Page 71 Example ...
Page 92: ...BP209 Series 7 Operation Instructions Page 90 21424 D02 ...
Page 119: ...BP209 Series 7 Operation Instructions Rev 8 1 14 Feb 2022 2022 Thorlabs Page 117 ...
Page 158: ...BP209 Series 11 Appendix Page 156 21424 D02 11 10 Drawing M2MS BP209 ...
Page 162: ...BP209 Series 11 Appendix Page 160 21424 D02 11 14 Certifications and Compliances ...
Page 167: ...www thorlabs com ...