BP209 Series
7 Operation Instructions
Page 84
21424-D02
Installing the Transportation Lock
1. Switch off the power supply.
2. Remove the 4 screws fixing the top cover using a 0.05" hex key (supplied with the M2MS)
and remove the cover.
3. Move the stop latch as indicated in the picture below and place the platform of the stage
against the left stop. Then install the transportation lock; do not tighten the fixing screw
yet.
4. Push the platform to the left stop, turn the lock counterclockwise and tighten the lock
screw.
5. Place back the top cover and fix it using the 4 screws. Now, the M2MS is ready for trans-
portation.
Summary of Contents for M2MS
Page 2: ...Copyright 2022 Thorlabs Version Date 8 1 14 Feb 2022 ...
Page 73: ...BP209 Series 7 Operation Instructions Rev 8 1 14 Feb 2022 2022 Thorlabs Page 71 Example ...
Page 92: ...BP209 Series 7 Operation Instructions Page 90 21424 D02 ...
Page 119: ...BP209 Series 7 Operation Instructions Rev 8 1 14 Feb 2022 2022 Thorlabs Page 117 ...
Page 158: ...BP209 Series 11 Appendix Page 156 21424 D02 11 10 Drawing M2MS BP209 ...
Page 162: ...BP209 Series 11 Appendix Page 160 21424 D02 11 14 Certifications and Compliances ...
Page 167: ...www thorlabs com ...