
Chapter 2 ’Installation and Startup’ — Powering Off the Device
54
Amethyst III DTV Smart Switch
User Manual
Relays
: you may define the relays meaning:
-
Relay 1:
Power
or defined
in configuration
(as discussed
in
-
Relay 2:
Error
or defined
in configuration
.
-
Relay 3:
Warning
or defined
in configuration
.
Interfaces
(available only on platforms in ATSC mode): lets you
change the interface type from ASI to SMPTE 310M or inversely.
This operation implies a reboot of the equipment.
Reboot
: making the equipment restart.
Delete equipment data
: formatting the compact flash card. This
deletes all the configurations and the closed alarms list.
Supervise
: launching the equipment Web GUI.
Back
: going back to previous display.
Powering Off the Device
Once you have configured the IP address and the date and time of the
equipment, turn off the device by unplugging the power supply cables.
Indeed, while you perform the signal connection, it is imperative that the
platform be powered off.
To be able to create a configuration and apply it to the equipment,
you must have the
Modify
and the
Apply
rights.
Relay 4 is always defined in the configuration.
Configurations are valid for both types of interfaces.
Summary of Contents for Amethyst III
Page 1: ...User Manual Release 02 22 Amethyst III DTV Smart Switch Edition A ...
Page 14: ...Preface Copyrights 14 Amethyst III DTV Smart Switch User Manual BLANK PAGE ...
Page 294: ...Appendix F Alarms 294 Amethyst III DTV Smart Switch User Manual BLANK PAGE ...
Page 306: ...Index 306 Amethyst III DTV Smart Switch User Manual tests 68 W Weight 214 ...