Thermo Scientific
iCAP RQ Pre-Installation Requirements Guide (P/N BRE0009927, Revision A)
I-1
A
about this manual
acceptance form
additional gas
argon
mass flow controller
oxygen
air conditioning
altitude
argon
consumption
requirements
supply
C
CCT gas
for installation test
helium
regulator
certification, of power conditioning devices
cleaning agents
Collision Reaction Cell
computer
heat generation
placing the data system
connecting
cooling water
fore vacuum pump
–
cooling capacity, of recirculating chiller
cooling gas
cooling water
connections
D
damage
documenting
to equipment
data system
dimensions
placing
workbench
delivery terms
dimensions and weights
dimensions, of packed units
,
distilled water, for cleaning
drip pan, for fore vacuum pump
drip tray
dust
E
electronic components
electrostatic discharge (ESD)
damage
precautions
entrance requirements
exhaust
port location
system
external warning sensor
F
failures, repair
filtering solvents
floor
covering
floor space
without autosampler
fore vacuum pump
connecting
heat generation
location
freight insurance
G
gas pressure regulator
gas supply
argon
connections
generate inductively coupled plasma
general pre-installation information
H
handles
harmonic distortion
heat exhaust
heat generation
computer
fore vacuum pump
monitor
Index