Power Conditioning Devices
Various line voltage conditioning devices are available that can correct
your line voltage problem. If you have good regulation but the power
line disturbance analyzer shows transient voltages, then an
isolation/noise suppression transformer should be adequate to resolve
the problem. If there are both transient and regulation problems, then
you should consider power conditioners, which can control both of
these problems.
Your electrician should install the buck/boost transformer before the
installation of your system is started.
NOTICE
For compliance and safety, ensure that your power
conditioning devices are certified by recognized domestic and
international organizations (for example, UL, CSA, TÜV, and VDE).
▲
Uninterruptible Power Supply
If your local area is susceptible to corrupted power or power disruptions,
then an uninterruptible power supply (UPS) should be installed in your
laboratory.
NOTICE
For compliance and safety, ensure that your uninterruptible
power supply (UPS) devices are certified by recognized domestic and
international organizations (for example, UL, CSA, TÜV, and VDE).
▲