MAX/Wall
®
Technical Wall System
20
3.4 Anchoring MAX/Wall Frames
to Floor
(Cont.)
2. Using the floor clamp as a template, drill two (2)
1/2" diameter holes in the floor through the holes
in the clamp. The holes must be at least 3-1/4"
deep into the floor (not including the clamp). See
Figure 3-7.
3. Clean the dust from the floor and holes. The dust
can be blown from the hole.
4. To insure proper depth of embedment, position
nut on anchor so that only one thread is visible
above the nut. Insert anchors into drilled holes
and tap down until the washer and nut are seating
against the floor clamp. See Figure 3-8.
5.
Repeat Steps 1, 2, and 3 for the holes on the
opposite end of the MAX/Wall frame. The wall
frame is now pinned into position.
Note:
If base molding is required, add the base
molding floor angles at this time. See
Installing Base
Molding Support
for instructions.
6. Tighten floor anchors “Hilti Bolts” with wrench to
65 Ft. Lbs. Torque. (Fisher Hamilton Part No.
12100, “Hilti” No. 45367). See Figure 3-9.
7. Repeat the above procedures for additional
MAX/Wall frames until all are fastened in place.
8. Level MAX/Wall frame assembly and attach the
floor clamps to the wall frames with 3/8"-16 x 3-
1/2" HHCS and 3/8"-16 nuts.
Note:
Bolt length changes when wall frame attaches
to corner angles, or end covers.
9. Rough in electrical and plumbing if required.
10. Refer to
Installing Lower Facing Inserts.
Figure 3-7
Figure 3-8
Figure 3-9
Section 3 – Installing Wall Frames
Summary of Contents for FISHER HAMILTON MAX/WALL
Page 1: ......
Page 58: ...MAX Wall Technical Wall System 58...