Servicing
Optional Manifold Replacement
7-52
42iQHL Instruction Manual
Thermo Scientific
Use the following procedure to replace the manifold.
Equipment required:
Hex wrench, 9/16
Hex drive, 9/64
1.
Turn the instrument OFF, unplug the power cord, and remove the
cover (
Figure 2–1
).
2.
Unplug three electrical connections (J5, J6, and J8) from the Step POL
board 1.
Figure 7–53.
Replacing the Manifold pt 1
3.
Unfasten three nuts. Remove the nuts, front and back ferrules as shown
from span, zero in, sample back panel (
Figure 7–54
).
Optional
Manifold
Replacement
Summary of Contents for 42iQHL
Page 1: ...42iQHL Instruction Manual High Level NO NO2 NOx Analyzer 119018 00 27Sep2018 ...
Page 2: ......
Page 18: ......
Page 28: ......
Page 36: ...Operation Instrument Display 3 8 42iQHL Instruction Manual Thermo Scientific ...
Page 166: ......
Page 192: ......
Page 272: ......
Page 308: ......
Page 320: ......
Page 321: ......