Servicing
Capillary O-Ring Replacement
7-26
42iQHL Instruction Manual
Thermo Scientific
7.
Replace capillary and reassemble in reverse order.
Note
Fitting arrangements, number of capillaries and capillary sizes will
vary per instrument configuration.
▲
Use the following procedure to replace the capillary o-rings.
Equipment required:
O-ring pick tool
1.
Using a plastic o-ring pick tool, remove the o-ring.
Note
Be careful in not damaging the o-ring walls during this process. Refer
to
Figure 7–26
.
▲
Use the following procedure to replace the power supply.
Equipment required:
Phillips drive, #2
1.
Turn instrument OFF, unplug power cord, and remove the cover
(
Figure 2–1
).
2.
Unplug all electrical shown J9, J10, J24, J25, J26, and ground.
3.
Unfasten captive hardware.
4.
Slide power supply left, clearing three case floor plate keyways.
Capillary O-Ring
Replacement
Power Supply
Replacement
Summary of Contents for 42iQHL
Page 1: ...42iQHL Instruction Manual High Level NO NO2 NOx Analyzer 119018 00 27Sep2018 ...
Page 2: ......
Page 18: ......
Page 28: ......
Page 36: ...Operation Instrument Display 3 8 42iQHL Instruction Manual Thermo Scientific ...
Page 166: ......
Page 192: ......
Page 272: ......
Page 308: ......
Page 320: ......
Page 321: ......