The battery modules (ABO) and the Active Power Unit (APU) are delivered in cartons on pallets separate from the battery
rack. The scope of delivery should be checked against the delivery note and the requirements under point 4 “
Transport at
end-customer site
” and point 5 “
Installation location
” must be observed.
7.1 Schematic sketch
7 Battery storage TS
8
www.tesvolt.com
Installation Manual
E
(z.B. TS 40 Rack)
E.IA. .ENG-
TS
A.11
Summary of Contents for TS25
Page 1: ...Installation Manual TS 48 V ...
Page 2: ......
Page 28: ...26 www tesvolt com E IA ENG TS A 11 ...
Page 33: ......