Step
View
10
12
11
13
14
Mount the ABO side covers on the battery modules.
Lay the communication cable for the BAT COM using the included patch cable.
Start by running the cable from the APU (BAT COM) to the BAT COM IN of the
battery module installed below the APU. From there, run the cable from the
BAT COM OUT to the BAT COM IN of the next module, etc.
Plug in the rack balancing plugs (unless these were already plugged in upon
delivery). The plug with an internal bridge from 1 to 4 is plugged into Rack
Balancing In. The plug with an internal bridge from 1 to 2 is plugged into Rack
Balancing Out.
Connect the DC cable from the Sunny Island to the APU (CHARGER).
If you do not use pre-assembled cables from TESVOLT, it is important that an
earth leakage and short-circuit protected cable (such as NSGAFöU) are used.
Connect the communication cable from the Sunny Island (ComSyncIn)
to the APU (CAN SMA)
Installation completed!
Description/Note
13
www.tesvolt.com
E.IA. .ENG-
TS
A.11
Summary of Contents for TS25
Page 1: ...Installation Manual TS 48 V ...
Page 2: ......
Page 28: ...26 www tesvolt com E IA ENG TS A 11 ...
Page 33: ......