11.2 Properly installing the addressing switch of the Active Power Unit (APU)
Description
Right rotary switch
Left rotary switch
Master
Slave 1 (from Master 1)
Slave 2 (from M1)
Slave 3 (from M1)
Master
Slave 1 (from Master 2)
Slave 2 (from M2)
Slave 3 (from M2)
Master
Slave 1 (from Master 3)
Slave 2 (from M3)
Slave 3 (from M3)
Master
Slave 1 (from Master 4)
Slave 2 (from M4)
Slave 3 (from M4)
0
2
2
2
0
2
2
2
0
2
2
2
0
2
2
2
0
0
1
2
1
0
1
2
2
0
1
2
3
0
1
2
BAT COM
TERM
OFF
ON
CAN OUT
CAN IN
CAN SMA
LAN
Cluster 1
IP-ADRESSE: XXX.XXX.XXX.100
Cluster 2
IP-ADRESSE: XXX.XXX.XXX.101
Cluster 3
IP-ADRESSE: XXX.XXX.XXX.102
Cluster 4
IP-ADRESSE: XXX.XXX.XXX.103
IP-Adresse
22
www.tesvolt.com
E.IA. .ENG-
TS
A.11
Summary of Contents for TS25
Page 1: ...Installation Manual TS 48 V ...
Page 2: ......
Page 28: ...26 www tesvolt com E IA ENG TS A 11 ...
Page 33: ......