Use the pre-installed long rack balancing cable in the cabinet con-
nector set
4.3
to connect the bottom battery modules in the left
and right halves of the battery cabinet.
13
Connect the remaining battery modules on the right side, starting
from the bottom. Follow the specifications in section “5.9 Wiring
the battery modules” on page 22 et seq.
Using the pre-installed rack balancing cable
4.3
, connect the
rack balancing “OUT” connection of the top battery module on the
right half of the battery cabinet to the rack balancing “IN” connec-
tion of the top module on the left half of the battery cabinet.
WARNING!
Possible malfunction of the battery storage system due to faulty BatCom wiring
Incorrect connection of the BAT-COM communication cable leads to malfunctions in battery operation.
Ensure correct wiring in accordance with section “5.9 Wiring the battery modules” on page 22 et.
seq.
14
Connect the BAT-COM communication cable using the patch
cables
2.3
,
3.2
and
4.2
supplied. Using the patch cable
2.3
,
connect the “BAT-COM” connection
11
of the APU HV1000-S to
BAT-COM “IN” of the battery module positioned under the
APU HV1000-S. Using a patch cable
3.2
, connect the BAT-COM
“OUT” connection of the same battery module with the BAT-COM
“IN” connection of the next battery module.
15
Connect the remaining battery modules in the left half of the battery cabinet in the same way using the
patch cables
3.2
.
16
Establish the connection between the bottom battery modules
using the longer pre-installed patch cable
4.2
from the cabinet
connector kit.
17
Connect the remaining battery modules in the right half of the cabinet, starting at the bottom and
using the patch cables
3.2
. The last battery module’s BAT-COM “OUT” connection remains open.
18
Complete the commissioning protocol. You will find a template for this on the TESVOLT USB-Stick
11
.
Also note down the serial numbers/factory number of the battery inverter and peripheral devices
such as the SMA Data Manager M. Send the completed commissioning protocol to
[email protected].