CommIssIonIng
37
© TESVOLT We reserve the right to make technical changes! RD.TI.026.E.ENG_Installation_Manual_TSHV70OD_v.B.01 Last revised 01/2021
5
In the connector panel, insert the 35 A NH00 fuses
9
or
37
(see
“5.8 Connector panel” on page 19 et. seq.) for the consumer
branch in the right fuse holder. To do this, open the fuse holder
and push the fuses into the relevant slot parallel to the holder.
Then close the fuse holder.
6
Switch on the following circuit breakers
33
in the connector panel
D
in sequence:
1. F3 –> 2. F4 –> if necessary 3. F5 –> 4. F7. Information on assigning the circuit breakers can be found
in section “5.8 Connector panel” on page 19 et. seq.
7
Check and monitor the commissioned components as they start up. Also, check the display on the air
conditioner casing on the inside of the battery cabinet. On the communication components, check the
24 V power supply
31
and the switches
O
, the SMA Inverter Manager
P
and the
SMA Data Manager M
Q
.
8
Now commission the SMA Inverter Manager
P
.
9
Check and, if necessary, correct the settings for terminating and
addressing the TS HV 70 Outdoor (“TERM”
5
and “ADDRESS”
10
)
on the APU HV1000-S. “TERM” is to be set to “ON” when operating
a single TS HV 70 Outdoor and “ADDRESS” to “0” and “0”.
10
Press the ON/OFF switch (“SWITCH”)
17
on the APU HV1000-S.
11
The number of battery modules detected will be shown on the dis-
play (14 or 16). Confirm the correct number by tapping twice on
the marking
16
next to the display. If the number of modules dis-
played is not the same as the actual number, check the BAT-COM
wiring.
If the error persists, please email [email protected] or contact
the TESVOLT Service Line +49 (0) 3491 8797 - 200.
12
Tap beside the display again to access the next menu item. You
will now be shown the assigned IP address, which must start with
192.168.4. ….
The IP address is required to commission the battery inverter.
TERM
ON
OFF
ADRESS
BATTERY
CHARGER
ADDRESS