CommIssIonIng
© TESVOLT We reserve the right to make technical changes! RD.TI.026.E.ENG_Installation_Manual_TSHV70OD_v.B.01 Last revised 01/2021
13
The TS HV 70 Outdoor switches to “INIT” mode and the switch
starts to flash.
14
Insert the 125 A NH00 fuses
9.1
or
38
(see “5.8 Connector panel”
on page 19 et seq.) for the battery inverter in the left fuse
holder. To do this, open the left fuse holder and push the fuses into
the relevant slot parallel to the holder. Then close the fuse holder.
15
Wait until the battery inverter has completely powered up.
16
Start the commissioning process of the battery inverter with the
SMA LCS Tool. The software and a manual can both be found on
the TESVOLT USB-Stick
11
.
Once the commissioning process has
been successfully completed, the battery storage system switches
to precharge mode “PRECH”.
17
After pre-charge mode, the switch lights up permanently. “OK”
appears as the status on the display of the APU HV1000-S. Now
the battery storage system is ready for operation.
NOTE:
The display remains active for approximately two minutes and is then deactivated. It can be
reactivated by tapping twice.
18
Close the connector panel on the battery inverter. Then refit the
cover
I
and engage the lock using the key
T
.
8.2 COMMISSIONING TS HV 70 OUTDOOR SYSTEMS USING THE MASTER/SLAVE PRINCIPLE
ATTENTION! Possible damage to the battery due to incorrect configuration
Incorrect configuration can cause damage to the battery. The parameter settings influence the
SMA STPS 60’s charging behaviour. For this reason, it is important to make the correct settings during
commissioning.
STOP