Document 57.4400.7200 - 1
st
Edition 03/2005
INDEX
4
5
TELELIFT 3713 Elite - 4017 - 4514
SCHEDULED MAINTENANCE PROCEDURES
A-2
CHECK THE TIGHTENING OF THE WHEEL
BOLTS
If you have to check the tightening of the wheel bolts or
replace a wheel, proceed as follows:
-
Raise the machine by lowering one outrigger to the
ground or with a hydraulic jack.
-
Remove the wheel rolling it on the ground
-
Line up the wheel with the axle and fit the 8 nuts.
-
Tighten the nuts following the alternate sequence
shown in the picture with a pneumatic screwdriving
machine.
-
Raise the outrigger and lower the machine to the
ground.
Re-tighten all nuts to a torque 440 Nm
.
Check the tightening of wheels one hour after the
job. They might get loose until they do not stay
correct.
On new machines, and when a wheel has been
disassembled or replaced, check the nut torque of
the wheels every 2 hours until they stay correct.
Always use tyres having the dimensions indicated in
the vehicle registration card.
OPTIONAL
STANDARD
Telelift 3713 Elite
Telelift 4017-4514
Dimensions
(front and rear)
400/70-20
400/80-24
18-19.5
405/70-24
P.R.
(or load index)
14 pr
153B
16
14 pr / 151 D
Rim
13 x 20
13x24
13x19.5
13x24
Wheel disc
8 holes DIN 70361
Pressure
bar/Psi
4/58
4.25/61.6
4.5/65.2
4.25/61.6
1
2
3
4
5
6
7
8
Summary of Contents for TELELIFT 3713 Elite
Page 4: ...Courtesy of Crane Market...