START – UP REPORT
Start – UP Date: ______________________
Job Name: _______________________Unit Serial Number – U ________________
A Start- Up report must be submitted for each unit on the job. For warranty purposes, start – up
occurs when the equipment and/or blowers are started for operation regardless of when the building
may be ready for operation.
GENERAL
Initials or
3
1. Inspect the unit for shipping and installation damage.
2. Check Bill of Lading against material received
3. Make sure all packing material has been removed from unit.
4. Inspect unit demounts for proper re-assembly ( if unit shipped in sections )
PRE-START
1. Remove shipping lock down bolts. See drawing on inside Supply Fan access door
2. Check fan wheel set screws for tightness and motor and fan sheave for proper alignment
3. Manually rotate fan wheels and motors to assure freedom of movement
4. Check main supply voltage
5. Check electrical connections for tightness
6. Check main fan amp draw ( Refer to motor nameplate )
7. Check condensate drain traps ( Separate traps are required for each drain connection )
8. Inspect system piping for proper installation
9. Check to see that proper filters are installed
10. Clean inside of unit of all construction dirt and debris
11. Adjust access doors for proper alignment if necessary