FWR/FWT 10
Page
28
Temtrol, Inc
.
®
Manufacturers of ….. Customized Air Handling Units
(H) "START-UP" SERVICE
FANWALL
®
START – UP REPORT
(
if applicable)
VFD UNIT MODELS
Start – UP Date: ______________________
Temtrol recommends that the following
FWT START~UP REPORT
be performed on each unit and the results
filed with the appropriate facility engineering office.
Unit Nameplate Data
Model No.
Serial No.
Supply CFM:
Supply HP:
Exhaust/Return CFM:
Exhaust/Return HP:
Mechanical System Checks
Initials or
3
1. Visually inspect fanwall/fan cube for damage.
a. On Discharge side look for damage to Fans, Motors, Cells, etc.
b. On Inlet side look for damage to inlet straightening grid and frame as well as
cells.
2. Fan Wheel / Motor
a. Rotate fan wheel by hand to ensure it is properly aligned with inlet cone.
b. Check motor bearings as fan wheel is rotating. Bearings should operate freely
and be free of noise.
c. Check that shaft ground kit is installed correctly.
d. Check back draft damper for smooth operation if supplied. Open damper by
hand to ensure a full range of motion without obstruction.
3. HVAC
System
a. Check that all ducts, dampers and registers are set.
b. Check that all openings and penetrations are sealed.