
Getting Started
YBT250 Field Transmitter & Interference Tester User Manual
1- 7
Batteries
Installing or Removing a Battery
The NetTek Analyzer Platform comes standard with a single battery,
which is not installed when the instrument is shipped. Refer to
Figures 1--7 through 1--9 for battery installation or removal steps.
NOTE
. Disconnect power supply cables from the NetTek Analyzer
Platform before installing or removing batteries.
New batteries, or batteries that have not been used for an extended
period, must be charged before using them to power the instrument.
Refer to
Charging a Battery
on page 1--9 for more information.
Figure 1- 7: Opening the battery compartment
Summary of Contents for NetTek YBT250
Page 4: ......
Page 12: ...Table of Contents viii YBT250 Field Transmitter Interference Tester User Manual...
Page 19: ...Getting Started...
Page 20: ......
Page 39: ...Operating Basics...
Page 40: ......
Page 60: ...Operating Basics 2 20 YBT250 Field Transmitter Interference Tester User Manual...
Page 72: ...Connecting a Signal 2 32 YBT250 Field Transmitter Interference Tester User Manual...
Page 90: ...Changing Instrument Settings 2 50 YBT250 Field Transmitter Interference Tester User Manual...
Page 101: ...Reference...
Page 102: ......
Page 136: ...Displaying a Signal Spectrum 3 34 YBT250 Field Transmitter Interference Tester User Manual...
Page 170: ...Locating Interference 3 68 YBT250 Field Transmitter Interference Tester User Manual...
Page 259: ...Appendices...
Page 260: ......
Page 290: ...Appendix B Accessories B 4 YBT250 Field Transmitter Interference Tester User Manual...
Page 315: ...Glossary...
Page 316: ......
Page 322: ...Glossary Glossary 6 YBT250 Field Transmitter Interference Tester User Manual...
Page 323: ...Index...
Page 324: ......