Page 26 • MNKS025 ║ Issue/Rev. 0.1 (11/18)
MPU
Series
C
I/O/M
Manual
Operation
III. Guidance for equipment inspection and maintenance is provided by EN/IEC 60079-
17: “Electrical Apparatus for explosive gas atmospheres, “Inspection and maintenance
of electrical installations in hazardous areas” and should be utilized for the inspection
/ maintenance process.
IV. When performing maintenance that requires opening of the enclosure cover, all flame
paths, which are defined as the machined flanged surface between the housing and
the cover, shall be inspected to ensure that they are clean and undamaged, no
scratches, nicks, corrosion, or other defects that would affect the integrity of the flame
path are allowed. If defects are detected the equipment should not be placed back
into service until the issues are resolved.
V. Verify that all tapped cover bolt threaded locations in the enclosure are clean and
intact with no missing/stripped threads.
VI. For the UMC / TCI enclosure verify that the cover bolts are the required M6 x 1 - 6g x
20 mm Long, Din 912-A4-70, Stainless Steel P/N P8000007970 and (P/N
P8000007847 Drilled for seal wires).
For the UMH enclosure, when replacing any cover bolts with Hexagon socket head
cap screw ISO 4762 is for “regular type screw thread” M8 x 1.25 x 25 (6g), A2-70.
Cover screw minimum yield stress: MINIMUM YIELD STRESS 450 N/mm2.
Prior to reassembly apply a light coating of nickel based anti-seize such as
TechnipFMC P/N (646002401) to all bolt threads.
VII. Verify that any blind threaded cover bolt holes do not have excessive grease / anti-
seize packed into them as this could cause hydraulic fractures of the enclosure when
the bolts are tightened.
VIII. Inspect to see that the environmental O-ring is correctly installed (seated into the
groove) and in good condition, no cracks etc., if defective replace to maintain
environmental protection. Grease cover flange with petroleum jelly or TechnipFMC
grease (P/N 644886401) before reattachment of the cover to the housing.
IX. Ensure cover bolt torqueing has been completed, verify the flame path gaps as per
section 3.11 of this manual.
Summary of Contents for Smith Meter MPU 1600c
Page 10: ...Page 10 MNKS025 Issue Rev 0 1 11 18 Page intentionally left blank ...
Page 34: ...Page 34 MNKS025 Issue Rev 0 1 11 18 Page intentionally left blank ...
Page 38: ...Page 38 MNKS025 Issue Rev 0 1 11 18 Page intentionally left blank ...
Page 98: ...Page 98 MNKS025 Issue Rev 0 1 11 18 Page intentionally left blank ...
Page 106: ...Page 106 MNKS025 Issue Rev 0 1 11 18 Page intentionally left blank ...
Page 112: ...Page 112 MNKS025 Issue Rev 0 1 11 18 Page intentionally left blank ...
Page 119: ...Issue Rev 0 1 11 18 MNKS025 Page 119 Page intentionally left blank ...