16
5.
OPERATION
5.1
Start Dispensing
The valve is now ready to dispense. Dispensing fluid (via cartridge/syringe
or reservoir) must be connect the supply pressure regulator.
Enter the desired dispensing parameters refer to section 7.5.5 (Rising, Open
Time, Falling, Delay, Needle Lift and Number of Pulses), then touch ‘Save’
icon. Information to the values can be found in the table for ‘essential
parameters’ on the page below.
To start the dispensing, touch the ‘Run’
icon or use external start
signal for both
or dot
mode. When in line mode start
can only be activate or trigger by an external devised.
Attention
: To de-air (removal of air in the system) after going through a
calibration procedure in section 4.3. (e. g. after the change of
cartridge/syringe and/or after the remove of nozzle) use the Purge feature to
de-air. To purge touch and hold the ‘Purge’ icon
it will run the
parameter in the current program, and it will run until the purge icon is let
go.
5.2 Parameter Settings for the dispensing process
The TS9800 Jet Valve System works according to the control profile shown
below:
both
Figure 4: Control Curve
Delay
Open time
Rise
Fall
One Full Cycle
(Frequency)