70
OPERATION
Traveling the Machine
WARNING
�
Never allow anyone to enter the
machine working range and machine
path.
�
Signal your intention to move by
sounding the horn.
�
There are blind spots to the rear of the
machine. Check that the area is safe
and clear.
�
Remove any obstacles in the machine’s
path.
1. Increase the engine speed.
2. Set the safety lock lever to the released
position.
Machine Operation
Inspection After Warm-up
After warming up the engine and hydraulic
oil, perform the checks and inspections
described below, and repair if there is a
problem.
1. Check that the warning lamps and meters
are as follows :
• Are all the warning lamps off?
• Is the water temperature gauge showing
within the green range?
2. Check that there are no irregularities in the
exhaust color, sound and vibrations.
3. Set the safety lock lever to the locked
position and check that the control levers
are locked.
S2B015
S2D007
Summary of Contents for TCR50
Page 6: ...4 ...
Page 8: ...6 ...
Page 35: ...33 SAFETY Safety Signs Decals ...
Page 36: ...34 SAFETY Safety Signs Decals ...
Page 64: ...62 ...
Page 84: ...82 ...
Page 85: ...83 TRANSPORT Loading and Unloading 84 Hoisting the Machine 85 Securing the Machine 86 ...
Page 147: ...145 SPECIFICATIONS Main Specifications 146 Machine Dimensions 148 Operating Range 150 ...
Page 149: ...147 MEMO ...
Page 150: ...148 SPECIFICATIONS Machine Dimensions ...
Page 152: ...150 SPECIFICATIONS Operating Range ...
Page 154: ...152 ...
Page 155: ...153 OPTIONS General Precautions 154 Optional Equipment Mass 156 ...
Page 159: ...157 INDEX ...