127
MAINTENANCE
2
S2G028
1/2
Inspecting the Rubber Crawlers
Repair or replace the rubber crawlers if their
conditions are as described below. Consult
a Takeuchi sales or service outlet about
repairs or replacement.
Rubber crawler
Replace the crawler if the entire crawler is
stretched and cannot be adjusted.
(1) Lug
Replace if the height of (A) is 5 mm (0.2 in.)
or below.
(2) Steel cord
Replace if the steel cord is exposed over 2
or more links.
Replace if half or more of the steel cords on
one side are cut.
When Required
(3) Metal core
Replace if even one metal core is off.
(4) Rubber
Repair if there are cracks of 60 mm (2.4 in.)
or greater in length.
If the steel cord is visible, repair as soon
as possible, regardless of the length of the
crack.
S2G027
4
3
2
1
A
3
S2G029
60mm or greater
S2G030
Summary of Contents for TCR50
Page 6: ...4 ...
Page 8: ...6 ...
Page 35: ...33 SAFETY Safety Signs Decals ...
Page 36: ...34 SAFETY Safety Signs Decals ...
Page 64: ...62 ...
Page 84: ...82 ...
Page 85: ...83 TRANSPORT Loading and Unloading 84 Hoisting the Machine 85 Securing the Machine 86 ...
Page 147: ...145 SPECIFICATIONS Main Specifications 146 Machine Dimensions 148 Operating Range 150 ...
Page 149: ...147 MEMO ...
Page 150: ...148 SPECIFICATIONS Machine Dimensions ...
Page 152: ...150 SPECIFICATIONS Operating Range ...
Page 154: ...152 ...
Page 155: ...153 OPTIONS General Precautions 154 Optional Equipment Mass 156 ...
Page 159: ...157 INDEX ...