OPERATION
Operating Procedures
Operations Possible with this
Machine
Excavating
1. Set the dozer blade on the side opposite
the side you want to dig on.
2. Use the arm and bucket and dig with
shallow, long strokes. The digging force
is strongest when the boom and arm
angle is 80 to 120°. Use this angle for
effective digging.
Digging Ditches
Mount a bucket suited for digging ditches
and set the crawlers parallel to the ditch to
be dug for greater efficiency.
When digging wide ditches, dig the sides
first, the center later.
Digging Side Ditches
Use the offset function to dig side ditches
as shown in the diagram.
Loading
When loading dirt in a truck, starting from
the back of the truck’s bed makes for easier
loading and increases the amount of dirt
that can be loaded.
Also, use a small slewing angle for greater
efficiency.
E4D0501
80 ~120
E4D051
D5D030
Summary of Contents for TB23R
Page 6: ...4...
Page 8: ...6...
Page 35: ...33 SAFETY Safety Signs Decals...
Page 36: ...34 SAFETY Safety Signs Decals...
Page 150: ...148...
Page 152: ...150 MEMO...
Page 154: ...152 SPECIFICATIONS Machine Dimensions...
Page 156: ...154 SPECIFICATIONS Operating Range...
Page 158: ...156 MEMO...
Page 164: ...162...
Page 175: ...173 MEMO...
Page 182: ...180...
Page 183: ...181 INDEX...