![background image](http://html2.mh-extra.com/html/takeuchi/tb23r/tb23r_operators-manual_3344682005.webp)
3
MACHINE DESCRIPTlON
�
Front, rear, Ieft and right
This manual refers the front, rear, left and
right of the machine as seen when sitting
in the operator’s seat with the dozer blade
visible to the front.
�
Designated operations
Use this machine primarily for the following
operations:
�
Excavating
�
Digging ditches
�
Digging side ditches
�
Leveling
�
Loading
�
Features
�
Short pitch rubber crawler
�
Low engine noise and exhaust emissions
�
Slew cushioning system for easy bucket positioning
�
Tilt-up operators platform for easy access to major compartment
�
Break-in period
When the machine is new, heed the instructions below when operating the machine for the
first 100 hours (as indicated on the hour meter).
Using a new machine roughly without breaking it in will lead to quicker deterioration of
machine performance and may shorten the machine’s service life.
�
Warm up the engine and hydraulic oil sufficiently.
�
Avoid heavy loads and rapid operations. Operate with a load of about 80% the maximum
load.
�
Do not start up, accelerate, change directions, or stop abruptly unless necessary.
RIGHT
LEFT
REAR
FRONT
D5A003
Summary of Contents for TB23R
Page 6: ...4...
Page 8: ...6...
Page 35: ...33 SAFETY Safety Signs Decals...
Page 36: ...34 SAFETY Safety Signs Decals...
Page 150: ...148...
Page 152: ...150 MEMO...
Page 154: ...152 SPECIFICATIONS Machine Dimensions...
Page 156: ...154 SPECIFICATIONS Operating Range...
Page 158: ...156 MEMO...
Page 164: ...162...
Page 175: ...173 MEMO...
Page 182: ...180...
Page 183: ...181 INDEX...