![background image](http://html2.mh-extra.com/html/takeuchi/tb23r/tb23r_operators-manual_3344682133.webp)
131
MAINTENANCE
When Required
3. Operate the cylinder, line up pin hole (B)
in the bucket with the pin hole in the link
arm (6), and install the pin (2).
4. Line up the turn prevention holes, install
the bolt (1), and the nuts.
Be sure to leave a gap of about 0.5 ~ 1
mm (0.02 ~ 0.04 in.) between the nut and
bucket bush, or the nut will come loose.
5. Slide the O-ring (4).
Replacing the pin seal
1. Set the pin seal (3) in the direction shown
on the diagram above.
2. Use a mallet to slowly press the pin seal
in. Be careful not to damage the seal.
E4G056
4
E4G057
3
E4G055
0.5~1mm
1
(0.02~0.04 in.)
Summary of Contents for TB23R
Page 6: ...4...
Page 8: ...6...
Page 35: ...33 SAFETY Safety Signs Decals...
Page 36: ...34 SAFETY Safety Signs Decals...
Page 150: ...148...
Page 152: ...150 MEMO...
Page 154: ...152 SPECIFICATIONS Machine Dimensions...
Page 156: ...154 SPECIFICATIONS Operating Range...
Page 158: ...156 MEMO...
Page 164: ...162...
Page 175: ...173 MEMO...
Page 182: ...180...
Page 183: ...181 INDEX...