T.Werk GmbH - CHRONOS Click Pitched roof solution - Assembly instruction Page 12 of 24
9 Unpacking
DANGER
Danger of asphyxiation from foils and packaging material.
➢
Dispose of the foils and packaging material as soon as possi-
ble after unpacking.
Cut the lashing straps wrapped around the bundles and pallets with a cutter knife. Then re-
move the foils. Then cut the straps of the individual boxes. Now remove the assembly mate-
rial.
Check the assembly material immediately after receipt for completeness and for possible
damage during transport. In the event of a defect, contact T.Werk GmbH immediately.
10 Assembly
Needed tools:
1.)
Measuring tools for marking the module field (laser, angle, chalk/string, tape measure,
chalk/marker pen).
2.)
Cordless screwdriver/torque wrench
3.)
Screwdriver bits for hexagon socket SW6
4.)
Socket SW8
5.)
Torx TX-40
6.)
Angle grinder with diamond wheel
7.)
Safety eyewear
8.)
Open-end spanner SW13
Requirements
1.)
First check the roof for damage (cracks, holes, brittleness, ...). If necessary, document
the existing damage to the roof. Submit the documentation to your client before the
start of construction and before components are placed on the roof.
2.)
Before working on the roof, be sure to check the roof's residual load-bearing capacity.
During the entire assembly work, make sure that the maximum local load of the roof
is not exceeded. Otherwise the roof may be damaged.
3.)
Make sure that the roof is free of dirt, moss, water accumulation, snow, ice and ob-
jects. Do not start the installation until all these conditions are met.
4.)
Measure the module field according to the module assignment plan. Separate the
module fields after approx. 15-20 modules. This allows for thermal expansion of the
modules and creates a maintenance aisle. Mark the outer edges of the module field.
Check all dimensions on site before you start the installation.