background image

T.Werk GmbH - CHRONOS Click Pitched roof solution - Assembly instruction     Page 17 of 24 

 

 

3   Attach the roof fastening on a seam roof

 

3.1 

Measure the first profile position and the position of the clamps. Then mark them 
afterwards. 
 

Seam roof, modules vertikal, single-layer: 

 

Roof fastening 

1. Profile position 

2. Profile position 

CHRONOS RC 

 
Specification for number and 
placement of clamps: statics, 
distance between seams 
 
depending on snow load: skip 
rebates;  clamp  each  rebate 
at the outermost two rebates 
 
Cantilever  depending  on 
snow load up to 250 mm 
 

  
two  CHRONOS  Click 
profiles  per  module 
row 
 
Distance  depends  on: 
Module 

dimensions, 

clamping  range  of  the 
modules  (specification 
of  the  module  manu-
facturer). 
 
Distance  between  the 
modules  in  the  rows: 
approx. 10 mm 

 
near  the  clamp, 
distance 

max. 

25 - 30 cm 

 

Seam roof modules horizontal, double layer  

 

Roof fastening 

1. Profile position 

2. Profile position 

CHRONOS RC 

 
Specification for number and 
placement of clamps: statics, 
distance between seams 
 
depending on snow load: skip 
rebates;  clamp  each  rebate 
at the outermost two rebates 
 
Cantilever  depending  on 
snow load up to 250 mm 
 

 
Vertical distance of the 
1st profile and number 
of  clamps  depending 
on statics 
 
depending  on  snow 
load: approx. 80 to 125 
cm 

 
two CHRONOS pro-
files per module row 
 
Distance depends on: 
Module dimensions, 
clamping range of 
the modules (speci-
fied by the module 
manufacturer). 
 
Distance between 
the modules in the 
rows: approx. 10 mm 

 
near  the  clamp 
(1st 

profile 

layer),  in  the 
area  of  the  1st 
profile 

layer 

(2nd 

profile 

layer),  distance 
max. 25 - 30 cm 

 

3.2 

 
Mount the clamps at the marked positions.  
 

3.3 

Place the CHRONOS roof adapters on the clamp with the recess for the truss-head 
screw M8x25 facing downwards (1).  

Insert a truss-head screw M8x25 through the CHRONOS roof adapters and the clamp 
(2). 

Stretch a cord from the upper to the lower CHRONOS roof adapter of a row (3). The 
height-  and  position-accurate  alignment  facilitates  the  clicking  in  of  the  CHRONOS 
Click profile. Align the CHRONOS roof adapters exactly (4). 
Tighten the CHRONOS roof adapters with a flange nut M8 on the clamp (5). 

3.4 

The roof fastening for a seam roof is in place. 

Summary of Contents for CHRONOS Click

Page 1: ...CHRONOS Click Pitched roof Translation of the assembly instruction into english 49 8283 997904 0 info t werk eu www t werk eu...

Page 2: ...e 2 of 24 Manufacturer Contact ph 49 8283 997904 0 fax 49 8283 997904 299 e mail info t werk eu www t werk eu T Werk GmbH Zur Sch nhalde 10 D 89352 Ellzee CHRONOS Click Pitched roof Translation of the...

Page 3: ...itched roof solution 4 2 Usage of the assembly instruction 4 3 General informations 4 4 General safety instructions 5 5 Warranty conditions 6 6 Structure of the CHRONOS Click mounting system 7 7 Trans...

Page 4: ...ruction The installation instructions are part of the CHRONOS Click assembly system The document contains important information on all phases of the product s life especially on assembly The assembly...

Page 5: ...Only carry out the subsequent commissioning if you are a qualified specialist Only carry out maintenance and servicing if you are a trained specialist Failure to do so may result in personal injury a...

Page 6: ...ing improper maintenance instability and insufficient stability of the building substrate Signs of wear wearing parts Optical surface changes e g Discolouration of edges and punched holes on galvanize...

Page 7: ...roof hook ALU VAR triple adjustable roof hook pre assembled with CHRONOS roof adapter Bracket angle 35 mm EN AW 6082 T6 Base plate 120 mm EN AW 6063 T66 Screws SW13 A2 SOV01099 0 5 kg CHRONOS Dachhake...

Page 8: ...n ding on length Hanger bolt for wooden substructure M10 x 200 mm 3xFM 1xEPDM seal calotte SW7 stainless steel A2 building authority approval SOV00036 0 121 kg M10 x 250 mm 3xFM 1xEPDM seal calotte SW...

Page 9: ...00539 0 05 kg Round seam clamp Alu big SOV01050 0 05 kg RIB ROOF 465 clamp A2 SOV00225 0 4 kg RIB ROOF 500 clamp A2 SOV00838 0 4 kg RIB ROOF 500 clamp original SOV00957 0 4 kg Domitec clamp SOV00720 0...

Page 10: ...6063 T66 EN 755 9 Surface press finish w x h 44 8 x 50 mm SOV00849 2 98 kg Length 5 3 m Material Aluminium EN AW 6063 T66 EN 755 9 Surface press finish w x h 44 8 x 50 mm SOV00905 4 92 kg CHRONOS rai...

Page 11: ...H Depending on FH 0 014 kg bis 0 020 kg 7 Transport For the transport of the CHRONOS Click assembly system the CHRONOS Click profiles are packed into bundles according to the length of the profiles an...

Page 12: ...5 Torx TX 40 6 Angle grinder with diamond wheel 7 Safety eyewear 8 Open end spanner SW13 Requirements 1 First check the roof for damage cracks holes brittleness If necessary document the existing dama...

Page 13: ...le position 2 Profile position CHRONOS RC Specification for number and placement of roof hooks statics rafter spacing 65 120 cm Cantilever up to 500 mm depending on snow load With low snow loads and s...

Page 14: ...ow Distance depends on Module dimensions clamping range of the modules specifi cation of the module manufacturer Distance of the mod ules between the rows approx 10 mm near the roof hook 1st profile l...

Page 15: ...dwich elements the substructure is mainly laid horizontally wooden or steel purlins Therefore it is common to lay the modules horizontally with a single layer system Measure the profile position and t...

Page 16: ...s shafts Make sure that the EPDM seals which are already pre mounted on the hanger bolt are in full contact 2 5 Screw the hanger bolts vertically downwards Do not tighten the hanger bolt with torques...

Page 17: ...etween seams depending on snow load skip rebates clamp each rebate at the outermost two rebates Cantilever depending on snow load up to 250 mm Vertical distance of the 1st profile and number of clamps...

Page 18: ...Click Profile into place Use a lever tool to help you Place the lever tool on the CHRONOS Click Profile near a roof fastening point Place the lever tool in the channel as shown in the picture below Cl...

Page 19: ...profile at joints 4 5 Click the second profile into the rail con nector 1 Then slide the rail connector over both profiles 2 4 6 Screw two thin sheet metal screws into the holes provided in the rail c...

Page 20: ...y 2 Screw in the cylinder head screw M8 x 14 of the CHRONOS cross connector set with a hexagon socket SW6 at a torque of 10 Nm to fix the CHRONOS cross connector set on the first profile layer 3 5 3 A...

Page 21: ...at the beginning of the rail Make sure that there is a dis tance of 3 5 cm from the end of the profile 6 3 On the free standing side at the begin ning of the row place one compensat ing profile each...

Page 22: ...cket SW6 with a torque of approx 10 Nm observe the specifica tion of the module manufacturer 6 6 Repeat assembly steps 6 4 and 6 5 un til the end of the row 6 7 At the end of the row an additional com...

Page 23: ...Visually check that all modules are in the correct position 2 Spot check the strength of all screws 3 check the correct position of the balancing profile at the end of the row Contact T Werk GmbH if a...

Page 24: ...f solution Assembly instruction Page 24 of 24 T Werk GmbH ph 49 8283 997904 0 Zur Sch nhalde 10 fax 49 8283 997904 299 www t werk eu D 89352 Ellzee e mail info t werk eu T Werk GmbH Subject to change...

Reviews: