S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
232
TimeSource 3100
Index
097-72020-01 Issue 9: November 2003
ground
connecting
installing
grounding
guidelines
grounding rod
H
hardware faults, troubleshooting
Header, Retrieve
high/low current fault troubleshooting
Holdover event
Holdover event/alarm
Holdover mode
holdover, troubleshooting
I
IF interface
initialize log command
initialize register command
initialize system command
input
ensembing
input oscillator frequency
input span error
input, deleting
inputs
ensembling
monitoring
inspecting the unit
installation tools and material
installing
antenna
ground
isolation module
lightning suppressor overview
output module
IP address
IPGATE
IPSUBNET
IRIG-B TOD outputs
IRIG-B TOD specifications
isolation module, installing
Isolator kit, 5 MHz
L
Lamp, CRIT
LEDs, troubleshooting with
Summary of Contents for TimeSource 3100
Page 1: ...TimeSource 3100 GPS Primary Reference Source 097 72020 01 Issue 9 November 2003 ...
Page 49: ...3 Chapter Installation This chapter provides the steps required for installation and power up ...
Page 109: ...Chapter 4 TL1 Reference This chapter provides information for using the TL1 language ...
Page 203: ...Chapter 6 Specifications This chapter provides equipment specifications ...