3
TimeSource 3100
69
Installation
097-72020-01 Issue 9: November 2003
2
5
3
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
Module for IRIG-B TOD Outputs
Connect the four optional IRIG-B TOD outputs with the IRIG-B output module. See
Figure 13 for the connector location, and Figure 20 for the connections.
Figure 20. IRIG-B TOD Output Connections
Note:
Outputs 5, 6, 7, and 8 are not used
Summary of Contents for TimeSource 3100
Page 1: ...TimeSource 3100 GPS Primary Reference Source 097 72020 01 Issue 9 November 2003 ...
Page 49: ...3 Chapter Installation This chapter provides the steps required for installation and power up ...
Page 109: ...Chapter 4 TL1 Reference This chapter provides information for using the TL1 language ...
Page 203: ...Chapter 6 Specifications This chapter provides equipment specifications ...