Earth Ground Location Guidelines
The roof ring ground system, a Central Office grounding plate, and building structural steel
are examples of valid earth ground points. If the mounting plate cannot be bolted to a valid
earth ground, or if the mounting plate is to be installed in a nonmetallic junction box, bolt
the mounting plate to a point within 4.6 m of the valid earth ground.
Summary of Contents for TimeSource 3100
Page 1: ...TimeSource 3100 GPS Primary Reference Source 097 72020 01 Issue 9 November 2003 ...
Page 49: ...3 Chapter Installation This chapter provides the steps required for installation and power up ...
Page 109: ...Chapter 4 TL1 Reference This chapter provides information for using the TL1 language ...
Page 203: ...Chapter 6 Specifications This chapter provides equipment specifications ...