3
TimeSource 3100
51
Installation
097-72020-01 Issue 9: November 2003
2
5
3
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
Antenna
These installation procedures are to be used in support of local company procedures and the
Installation Job Specification.
Prior to installing the antenna, the site, antenna location, lightning suppressor location, cable
route, and all other details should be planned.
To install the antenna, refer to Figure 10, and perform Procedure B.
Warning:
Ensure that the lightning suppressor is placed away from electrical devices
or cabling that may induce arcing.
Figure 10. Antenna-to-Shelf Cabling
Summary of Contents for TimeSource 3100
Page 1: ...TimeSource 3100 GPS Primary Reference Source 097 72020 01 Issue 9 November 2003 ...
Page 49: ...3 Chapter Installation This chapter provides the steps required for installation and power up ...
Page 109: ...Chapter 4 TL1 Reference This chapter provides information for using the TL1 language ...
Page 203: ...Chapter 6 Specifications This chapter provides equipment specifications ...