![Symmetricom 5071A Assembly And Service Manual Download Page 128](http://html.mh-extra.com/html/symmetricom/5071a/5071a_assembly-and-service-manual_1419613128.webp)
2. Service
Assembly/Module Diagnostic Trees (Diagnostic Section 3)
112
QUESTION:
Is the measured voltage when multiplied by the high
voltage probe calibration factor between 3.3 kV and 4.3
kV?
If Yes:
Go to, 3.7.1.2
If No:
Remove power, replace A16 and retest.
3.7.1.2 Ion Pump Return Current Test
1
Use the INFO/PUMP menu selection to display the output of the Ion Pump
current monitor circuit.
QUESTION:
Was the current displayed between 3 and 5 microamps?
(The high-voltage probe must have an input resistance of 1
Giga
Ω
.)
If Yes:
Go to 3.7.1.3.
If No:
Go to 3.7.1.3.1.
3.7.1.3 Ion Pump Return Current Zero Test
1
Power down the instrument, and wait one minute for the A16 module voltages
to bleed down.
2
Disconnect the Ion Pump supply cable from the high-voltage probe and
locate the plug well clear of other conductors.
3
Re-power the instrument, wait 15 seconds, and use the
INFO/PUMP
menu
selection to display the Output of the Ion Pump current monitor circuit on the
LCD display.
QUESTION:
Is the displayed current between 0.0 and 1.0 microamps?
If Yes:
Ion Pump high-voltage supply is correct, Go to, 3.7.2.1.
If No:
Go to 3.7.1.3.1.
Summary of Contents for 5071A
Page 2: ......
Page 40: ...1 Performance Tests Verifying Specifications 5071A Complete Performance Tests 24 ...
Page 48: ...2 Service Pre Troubleshooting Information 32 Figure 2 1 Instrument Top View ...
Page 168: ...3 Theory of Operation Functional Block Descriptions 152 Figure 3 5 Power Supply Block Diagram ...
Page 173: ......
Page 194: ...5 Replaceable Parts How To Order A Part 178 ...
Page 197: ......